marek bajor mwm elektro

Marek Bajor Appointed to the council of the mining chamber of commerce and industry

Equipment modernization strategy in terms of investment cost optimization and plant operational continuity

Modernization at ZG Lubin. Precision of control as a guarantee of safety

Comparison of the ZPR device before and after modernization – on the left, the older version in a yellow case; on the right, the upgraded version in a red case with a refreshed design and MWM Elektro logo.

MWM Elektro Sp. z o.o. rope tension control system – measuring and recording unit (ZPR)

main fan station

MWM Elektro to modernize the main fan station at Shaft L-V in ZG Lubin

mechanical shaft door safety

RA1 and RA1-Ex locking devices – shaft door safety systems

International Congress of Copper Mining and Metallurgy

MWM Elektro at the KGHM 2025 Congress – united for industrial development

Comprehensive modernization of the 4L-2500/1000 hoisting machine in the “Wacław” shaft at KWK Mysłowice-Wesoła

system naciągu lin mwm elektro

New tool for configuring and calibrating WPS inserts – rope tensioning system by MWM Elektro

Modern drainage systems in KGHM Polska Miedź S.A. Mines – main drainage pump station project at the Polkowice–Sieroszowice Mining Division

1 2 3 4 Next