Comparison of the ZPR device before and after modernization – on the left, the older version in a yellow case; on the right, the upgraded version in a red case with a refreshed design and MWM Elektro logo.

MWM Elektro Sp. z o.o. rope tension control system – measuring and recording unit (ZPR)

main fan station

MWM Elektro to modernize the main fan station at Shaft L-V in ZG Lubin

mechanical shaft door safety

RA1 and RA1-Ex locking devices – shaft door safety systems

International Congress of Copper Mining and Metallurgy

MWM Elektro at the KGHM 2025 Congress – united for industrial development

Comprehensive modernization of the 4L-2500/1000 hoisting machine in the “Wacław” shaft at KWK Mysłowice-Wesoła

system naciągu lin mwm elektro

New tool for configuring and calibrating WPS inserts – rope tensioning system by MWM Elektro

Modern drainage systems in KGHM Polska Miedź S.A. Mines – main drainage pump station project at the Polkowice–Sieroszowice Mining Division

wciągarki wolnobieżne dla górnictwa

Slow-Speed drum winches WBW-220 and WBW-250

Nowoczesne technologie w przemyśle górniczym – projekt MPP-9

Completion of modernization and delivery of the MPP-9 machine to the client

Technical acceptance of the mechanical components of the B-1200/AC-2m/s hoisting machine completed

1 2 3 Next