Equipment modernization strategy in terms of investment cost optimization and plant operational continuity

Comparison of the ZPR device before and after modernization – on the left, the older version in a yellow case; on the right, the upgraded version in a red case with a refreshed design and MWM Elektro logo.

MWM Elektro Sp. z o.o. rope tension control system – measuring and recording unit (ZPR)

main fan station

MWM Elektro to modernize the main fan station at Shaft L-V in ZG Lubin

International Congress of Copper Mining and Metallurgy

MWM Elektro at the KGHM 2025 Congress – united for industrial development

system naciągu lin mwm elektro

New tool for configuring and calibrating WPS inserts – rope tensioning system by MWM Elektro

Modern drainage systems in KGHM Polska Miedź S.A. Mines – main drainage pump station project at the Polkowice–Sieroszowice Mining Division

practical training for students in the industrial sector

MWM Elektro – Internships as a key element in training future engineers

naczynie do transportu ludzi

Modernization of a 4-story high transport vessel