Comparison of the ZPR device before and after modernization – on the left, the older version in a yellow case; on the right, the upgraded version in a red case with a refreshed design and MWM Elektro logo.

MWM Elektro Sp. z o.o. rope tension control system – measuring and recording unit (ZPR)

Modern drainage systems in KGHM Polska Miedź S.A. Mines – main drainage pump station project at the Polkowice–Sieroszowice Mining Division

practical training for students in the industrial sector

MWM Elektro – Internships as a key element in training future engineers